Skip navigation

Media Release Picton Bypass Community Invited To ‘Have Their Say’ On The Proposed Picton Bypass Design And Technical Studies Review Environmental Factors

18 November 2026 

Community invited to ‘Have Their Say’ on the proposed Picton Bypass Design and Technical Studies

The concept design drawings, Review of Environmental Factors (REF) and supporting technical documents are officially on display by Transport for NSW for public feedback today and until 18 December 2026.

The proposed Picton Bypass includes a new 1.9-kilometre, two-way single lane road connecting Remembrance Driveway, south of Wonga Road, with Picton Road, north-west of Maldon Bridge Road. A shared user path is also proposed to improve walking and cycling connections in the area. 

The new east-west connection between Remembrance Driveway and Picton Road, providing an alternate route for through traffic and helping to reduce traffic in the Picton town centre, while improving travel reliability, road safety and network resilience across the region. 

The Picton Bypass has the potential to improve the efficiency of the local transport network, support future growth and provide more reliable access for residents, businesses and freight operators travelling through the region. Importantly, the proposed bypass would also strengthen network resilience by providing an alternative route during emergencies and major incidents, including bushfires and floods.

Feedback received during the REF exhibition will help inform future project development, including consideration of mitigation measures, design refinements and any further investigations that may be required. The REF exhibition is an important step towards completing the planning approval process for the Picton Bypass. Finalisation of the concept design and Review of Environmental Factors will also help inform future project costs and funding requirements. 

Community feedback will play an important role in shaping the next stages of the project and people can view the REF, concept design and supporting technical documents and provide feedback by visiting the website nswroads.work/pictonbypass

It is highly recommended that the local residents, business owners and other interested members of the community view the Picton Bypass Project documents, ask questions of the Transport for NSW Project Team and provide direct feedback on the project at one or more of the three community consultation sessions to be held during the public exhibition period: 

  • Saturday 28 November 10:00am to 2:00pm, Picton Town Square

  • Wednesday 2 December 10:00am to 2:00pm, Picton Mall and

  • Saturday 12 December 11:00am to 3:00pm, Picton Bowling Club 

Submissions can also be made via email [email protected] or mail to Picton Bypass, Transport for NSW, PO Box 973, Parramatta NSW 2150. Consultation closes 18 December at 11.59pm.  


Quotes from Judy Hannan MP, Member for Wollondilly
:

“The exhibition of the Picton Bypass concept plan and Review of Environmental Factors represents an important step forward, shaping future transport infrastructure in Wollondilly.”

“Community consultation is an important opportunity for local residents, businesses and road users to examine the proposal and provide feedback.”

“The Picton Bypass has the potential to deliver long-term benefits for the region by improving travel options, helping reduce traffic through Picton Town Centre, supporting resilience of existing residents and road users and supporting future growth.”

“Local knowledge is incredibly valuable, and I encourage people with an interest in this project to attend one of the three community consultation sessions taking place in Picton, take the time to review the plans and make a submission. 


Quotes from Wollondilly Shire Council Mayor Matt Gould:

“This an amazing milestone that brings the desperately needed Picton Bypass one step closer to reality. I look forward to seeing the project continuing to gain momentum and seeing full funding allocated and construction taking place in the very near future.

Thanks to our local state member, Judy Hannan MP for her great work in advocating hard for the Picton Bypass as her number one priority for this term of government, to the NSW Government for progressing the project, to our Councillors and staff for their strong advocacy as well as all the strong advocates for this project." 

Media: [email protected]  or Louise Edgecombe 0437 353 209



NSW Government media release: 

Picton Bypass Concept Design and Review of Environmental Factors (REF)